Homepage | Set Home | Add to Favorites
Member

Chengdu Derbo Steel Co., Ltd.


Products
  • No Category
Search
 

Friends links
  • No link

ASTM a815 S31803 duplex stainless steel pipe
Click image to view full size image
Product: Views:62ASTM a815 S31803 duplex stainless steel pipe 
Unit price: Negotiable
MOQ:
Quantity:
Delivery date: Since the payment date Days delivery
Valid until: Long-term effective
Last updated: 2017-12-25 17:04
  Inquiry
Details
Model Number: Derbo-27-#0369 Brand Name: Derbo Steel Key Specifications/Special Features: Out diameter: 21.3mm-609.6mmThickness: SCH10S 40S 80S 160Length: SRL; DRL; 5.8M; 11.8M,Fixed Length as per client’s requirements.Steel standard: A213 A312 A815
Steel material: TP304 TP304L TP316 TP316L TP347H, S31803 (2205) S32750 (2507)
Surface: picking; manual polished.anti-corrosion coating (3LPE 3LPP FBE)
Package: plain/bevel end with end caps. waterproof packing, bare packing, in bundle, nest packing, standard export packing
Inspection: SGS;BV.
Certificate: ISO9001; 2000
Date of delivery: after received deposit 15-60 days according to the quantity
Payment: T/T; 100% L/C at sight; Western Union; D/A; D/P; O/A
Port of shipment: Xingang Tianjin; Shanghai Port; Guangdong port; Ningbo Port; Qingdao port.

Our advantages
  1. Professional sales team with more than 10 years experience in steel industrial
  2. Technical engineer from oil company and third party inspection company
  3. One-stop service for steel industry, especially for pipeline project application
  4. Rich cooperation experience with Shell, Lukoil, Samsung
  5. Competitive price, fast delivery time, excellent service
Quality control
Quality control is the basic but most important point for qualification of the steel pipes/tubes & fittings.
We carry out in-production supervision and after-production inspection for our products.
We ensure that the products are produced, tested and inspected strictly according to standard specification under supervision of our QA engineer during production.
After production inspection is carried out by worldwide famous third party inspection company like BV, SGS, Intertek
Shipping Information:
  • FOB Port: China (Mainland)
  • Lead Time: 15 - 50 days
Main Export Markets:
  • Asia
  • Australasia
  • Central/South America
  • Eastern Europe
  • Mid East/Africa
  • North America
  • Western Europe
Inquiry